{"product_id":"advanced-bim-management-dolibarr","title":"Advanced BIM Management - Dolibarr","description":"\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e1. Module Overview\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eAdvanced BIM Management (Gestion BIM Avancée) turns Dolibarr into a complete BIM management platform and business-level Common Data Environment (CDE). It centralises digital models, documents, stakeholders, validation processes, coordination issues, costs, schedules, deliverables and operational data for a construction project across its full life cycle — from programming and design through construction, handover, operation and maintenance — without modifying the Dolibarr core. The module manages the processes, data, responsibilities, versions, deliverables, coordination, quantities, costs, planning, reporting and integrations; it interfaces with external BIM software for 3D visualisation and geometric analysis while keeping all management data inside Dolibarr.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e2. Target Users\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eProject owners, delegated owners and owner's assistants (MOA \/ AMO).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eArchitects, engineering and design offices (BET), BIM Managers and BIM Coordinators.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eBIM modellers, quantity surveyors, economists and OPC schedulers.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eConstruction companies, subcontractors and suppliers.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eInspection bodies, operators, facility managers and maintainers.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e3. BIM Project Management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eEach BIM project links the project owner, prime contractor, architect, BIM Manager and coordinator, main contractor, location and GPS, building type, area and budget, planned\/actual dates, current phase, BIM maturity level, delivery method, CDE platform, convention version and a live conformity rate, with a full status workflow (study, design, consultation, execution, site, handover, DOE, operation). Projects are organised into configurable phases and milestones (ESQ, APS, APD, DCE, EXE, construction, acceptance, DOE) each with LOD\/LOI targets, planned\/actual dates and progress.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e4. BIM Execution Planning (BEP \/ Convention)\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eBIM conventions (BEP) are managed by version with objectives, scope, use cases, roles and responsibilities, tools, exchange formats, naming rules, coordinate system, units, controls, deliverables and collaboration rules, with a full version history.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e5. Information Requirements\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eOrganisational, project, asset, exchange, technical and regulatory information requirements (EIR\/PIR\/AIR) are captured with category, discipline, LOD\/LOI, responsible, expected deliverable, control method, due date and a conformity\/compliance matrix.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e6. Common Data Environment (CDE)\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eA structured CDE manages work-in-progress, shared, published and archived files with document states (WIP, shared, submitted, in review, approved, published, archived, obsolete). Each document records discipline, phase, zone\/building\/level, author\/reviewer\/approver, version\/revision, format, size, checksum, confidentiality and validation dates. A configurable naming engine enforces the project naming convention and detects non-conforming names and duplicates.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e7. IFC Model Management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eDigital models (maquettes) are managed per discipline (architecture, structure, HVAC, plumbing, electrical, drainage, coordination) with source software, IFC version, object count, LOD\/LOI, checksum, coordinate system and a status workflow (draft, deposited, checking, to fix, validated, published, archived). IFC handling is designed as an extensible architecture ready to plug into IfcOpenShell, xeokit \/ IFC.js, BIMserver or That Open Engine for metadata extraction, property\/quantity extraction and geometric comparison, with clear connector configuration and error handling.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e8. BCF Issue Management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eFull BCF topic management: GUID, type, priority, discipline, IFC object, viewpoint, due date, comments and attachments, with import\/export of BCF and a life cycle (open → assigned → in progress → resolved → to verify → closed), rejection, reopening and reporting.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e9. Clash Management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eA clash register captures hard\/soft\/clearance\/regulatory\/reservation\/sequence\/accessibility clashes with disciplines, zone, distance, severity, assignee, solution and a link to a BCF topic. Configurable control rules (inter-discipline, clearance, headroom, maintenance, naming) drive detection with thresholds, engine and last-run results; clash import, grouping, mass assignment\/validation, statistics and export are supported.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e10. Model Review \u0026amp; Version Control\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eModel review sessions record facilitator, participants, objectives, decisions and issue counts. A full version\/revision system keeps every model and document version with author, date, reason, checksum and detected changes (objects added\/removed\/modified), and prevents silent overwrite of a published version.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e11. RFI \u0026amp; Approvals\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eRequests for information (RFI) carry recipient, discipline, priority, due date, answer, cost and delay impact, with overdue detection. Validation\/visa circuits cover models, plans, notes, deliverables and DOE with a decision (approved, approved with comments, to fix, refused), reserve and full history.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e12. 4D Planning\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003e4D tasks link BIM objects to Dolibarr projects and tasks by lot\/zone\/building, with planned vs. actual dates and progress, colour-coded status and overdue detection, feeding a 4D progress comparison.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e13. 5D Cost Management \u0026amp; Quantity Take-off\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eQuantities are extracted or imported by type (area, volume, length, count, mass), classification and lot, and linked to Dolibarr products. Estimates (budget, DQE, BPU, take-off, comparative) hold priced lines; 5D cost lines track budget, committed, ordered, invoiced, paid and forecast-at-completion per lot\/discipline, linked to Dolibarr quotations, orders and invoices.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e14. Construction Monitoring \u0026amp; Quality\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eSite tracking and daily site logs record progress, quantities, weather, headcount, works done and incidents. Quality controls (documentary, geometric, property, conformity, site, equipment, DOE) capture conformity and corrective actions; a non-conformity register drives correction and verification, and can spawn a task, a BCF topic, an RFI or an intervention.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e15. Deliverables \u0026amp; Digital Handover (DOE)\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eA deliverables matrix tracks expected\/received\/validated\/late deliverables per phase and discipline with LOD\/LOI, format and dates. The digital handover (DOE) module manages as-built models, plans, data sheets, warranties, certificates, manuals, photos and COBie data through a collection-to-delivery workflow with a completeness report. COBie data (Facility, Floor, Space, Zone, Type, Component, System, Spare, Document, Contact) is managed with missing-field validation.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e16. Asset \u0026amp; Facility Management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eSpaces (building\/level\/zone, function, area, volume, capacity, occupancy) and assets\/equipment (IFC GUID, classification, system, manufacturer, serial number, install\/commission dates, cost) are inventoried and linked to Dolibarr products, suppliers and interventions. Warranties (manufacturer, decennial, biennial, perfect completion) and maintenance (preventive, corrective, regulatory, predictive) are tracked with expiry alerts.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e17. BIM Digital Control Room Dashboard\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eA modern dark control-room dashboard shows a header band (active projects, conformity rate, last published model, open BCF topics, critical clashes, 4D progress, 5D budget consumed, DOE completeness, critical alerts), an interactive discipline map (models, published, pending, open issues per discipline), KPI grids and charts (BCF by discipline and status, clash evolution, RFI per period, model versions per month, 5D cost by lot) and an operational to-do zone.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e18. Reporting\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eDecisional reporting spans projects, models, documents, BCF coordination, clashes, RFI, quality, 5D costs, deliverables, DOE and assets — each filterable, printable and exportable to CSV with per-column totals.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e19. Dolibarr Integration\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eThird parties \u0026amp; contacts: project owners, architects, design offices, contractors, suppliers, controllers, operators.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eProducts\/services, Projects \u0026amp; Tasks (4D), Contracts, Invoices \u0026amp; Payments (5D), Interventions (maintenance).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eAgenda events and GED document storage with a structured folder tree.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e20. Multilingual Support, API, Connectors, Security, Demo Data\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eFive languages: French, English, Spanish, Italian, German (no hard-coded UI text).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eSecured REST API: \/api\/index.php\/bimmanagement\/ (projects, models, bcf, clashes, rfi, deliverables, assets, dashboard) with API-key authentication and per-group permissions.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eExtensible connector architecture (Autodesk Construction Cloud \/ BIM 360 \/ APS, Revit, Navisworks, Solibri, BIMcollab, Trimble Connect, Speckle, Microsoft Project) — optional and configurable; API keys are never stored in clear text.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003e14 fine-grained permission groups plus reporting and sensitive rights (5D costs, connector administration); CSRF protection, escaped output, per-object access control, scheduled tasks.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eOne-click demonstration dataset that installs and removes cleanly, preserving real data (only rows tagged BIMMGMTDEMO are removed).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 15.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #152238;\"\u003e21. Installation \u0026amp; Complete Feature List\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003eCopy the bimmanagement folder into htdocs\/custom\/ and activate it from Configuration → Modules. Activation creates the llx_bim_* tables, menus, 46 permissions and a coherent demonstration dataset. Requires Dolibarr \u0026gt;= 16.0, PHP \u0026gt;= 7.1, MySQL\/MariaDB.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003e37 business objects with filterable lists, detailed cards and cross-object navigation.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eBIM projects, phases, conventions, information requirements, use cases, actors (RACI).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eCDE documents \u0026amp; versions, digital models \u0026amp; versions, federations, model reviews.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eBCF topics, clashes, control rules, RFI, validations, change management.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eQuantities, 5D estimates \u0026amp; lines, 5D cost lines, 4D tasks.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eSite tracking, daily logs, quality controls, non-conformities.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eDeliverables, DOE, COBie, spaces, assets, warranties, maintenance.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003eRisks, alerts, connectors, BIM Digital Control Room dashboard, multi-axis reporting, REST API, 5 languages.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cspan lang=\"EN-US\"\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" align=\"center\" style=\"text-align: center;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 9.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%;\"\u003e© 2026 DoliResources — www.doliresources.com\u003c\/span\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"Dolibarr Resources","offers":[{"title":"Default Title","offer_id":53955597435198,"sku":null,"price":299.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0986\/4174\/0094\/files\/RefinedVectorLogoforDoliCRMPro_60b79d0b-fea2-4843-a889-ba57a27424a7.png?v=1784824657","url":"https:\/\/doliresources.com\/products\/advanced-bim-management-dolibarr","provider":"DoliResources","version":"1.0","type":"link"}