{"product_id":"control-office-management-dolibarr","title":"CONTROL OFFICE MANAGEMENT - Dolibarr","description":"\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e. Module Overview\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eInspection Bureau Management is a complete ERP platform, integrated with Dolibarr, designed to manage all the activities of a Technical Inspection Bureau. It covers all the classic inspection missions in civil engineering, building construction, roadworks and utilities, hydraulics, electricity, fire safety, accessibility and infrastructure.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eThe architecture places the control mission at the center (cockpit): from within a mission, the user has direct access to studies and plans, site visits, reservations, reports, technical opinions, acceptances, and associated documents. The module is multi-entity, multilingual, and fully integrated with Dolibarr's native modules (Third Parties, Projects, Quotes, Orders, Invoices, Calendar, HR, Document Management).\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003eGoals\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eCentralize the management of control missions and projects.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eIndustrialize the control of studies, plans and calculation notes.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eRecord site visits, reservations and their resolution.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eGenerate inspection reports, technical opinions and acceptance reports.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eManage activity in real time via a decision-making dashboard.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eTrack profitability by mission, client and project.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eProduce a complete report (technical, financial, resources, quality).\u003c\/span\u003e\u003c\/p\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e2. Control areas covered\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003ctable class=\"MsoTableLightListAccent1\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse: collapse; border: none; mso-border-alt: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; mso-yfti-tbllook: 1184; mso-padding-alt: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003ctbody\u003e\n\u003ctr style=\"mso-yfti-irow: -1; mso-yfti-firstrow: yes; mso-yfti-lastfirstrow: yes;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border-top: solid #4F81BD 1.0pt; mso-border-top-themecolor: accent1; border-left: solid #4F81BD 1.0pt; mso-border-left-themecolor: accent1; border-bottom: none; border-right: none; background: #0D6E7A; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 5;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\" style=\"color: white;\"\u003eDomain\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border-top: solid #4F81BD 1.0pt; mso-border-top-themecolor: accent1; border-left: none; border-bottom: none; border-right: solid #4F81BD 1.0pt; mso-border-right-themecolor: accent1; background: #0D6E7A; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 1;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\" style=\"color: white;\"\u003ePerimeter\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 0;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-right: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 68;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eStructural Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-left: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 64;\"\u003e\u003cspan lang=\"EN\"\u003eReinforced concrete, metal framework, foundations, special structures.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 1;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-left: solid #4F81BD 1.0pt; mso-border-left-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 4;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eCivil Engineering Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-right: solid #4F81BD 1.0pt; mso-border-right-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal;\"\u003e\u003cspan lang=\"EN\"\u003eBuildings, civil engineering structures, hydraulic engineering, infrastructure.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 2;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-right: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 68;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eVRD control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-left: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 64;\"\u003e\u003cspan lang=\"EN\"\u003eRoads, sanitation, drinking water, various networks.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 3;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-left: solid #4F81BD 1.0pt; mso-border-left-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 4;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eElectrical Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-right: solid #4F81BD 1.0pt; mso-border-right-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal;\"\u003e\u003cspan lang=\"EN\"\u003eLow voltage (LV), medium voltage (MV), public lighting, electrical safety.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 4;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-right: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 68;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eFire Safety Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-left: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 64;\"\u003e\u003cspan lang=\"EN\"\u003eSmoke extraction, evacuation, firefighting resources.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 5;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-left: solid #4F81BD 1.0pt; mso-border-left-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 4;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eAccessibility Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: none; border-right: solid #4F81BD 1.0pt; mso-border-right-themecolor: accent1; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal;\"\u003e\u003cspan lang=\"EN\"\u003eAccessibility for people with reduced mobility (PMR), public access buildings (ERP), regulatory standards.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 6; mso-yfti-lastrow: yes;\"\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-right: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 68;\"\u003e\u003cb\u003e\u003cspan lang=\"EN\"\u003eTechnical Execution Control\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"288\" valign=\"top\" style=\"width: 216.0pt; border: solid #4F81BD 1.0pt; mso-border-themecolor: accent1; border-left: none; padding: 0cm 5.4pt 0cm 5.4pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm; line-height: normal; mso-yfti-cnfc: 64;\"\u003e\u003cspan lang=\"EN\"\u003eWork control, quality control, compliance control.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e3. Detailed Features\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.1 Customer Management\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eDirect link with the Dolibarr Third Party module. Target audience: developers, project owners, government agencies, local authorities, construction companies, engineering firms, architects. Complete history of projects, reports, and invoices per client.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.2 Project Management\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eLink with the Projects and Tasks modules. Each project includes: reference, client, location, amount of work, engineering firm, architect, company, laboratory, type of work, start and end dates.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.3 Control missions (central hub)\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eCore of the module. Types: Studies, Execution, Acceptance, Expertise, Diagnosis. Each mission has an automatic reference (BC-MIS-xxxxx), a project, a domain, a manager, assigned controllers, dates and a fee amount excluding VAT.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN\"\u003eStatus: Planned, In progress, Suspended, Completed, Closed.\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.4 Control of studies \u0026amp; plans\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eManagement of architectural plans, structural plans, infrastructure plans, calculation notes and specifications. Each document receives a compliance notice: Compliant, Compliant with observations, or Non-compliant.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.5 Site visits\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eDetailed record: date of visit, project, participants, GPS coordinates, observations and reservations. Preparation of visit reports and summaries.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.6 Reserve Management\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eFor each reservation: reference, description, category (Structure, Architecture, Infrastructure, Electricity, Safety), severity (Minor, Major, Critical), responsible party, and deadline. Status: Open, In Process, Resolved, Rejected.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.7 Control Reports\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eGenerator for preliminary, intermediate and final reports. Structured content: project, findings, reservations, conclusion and opinion.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.8 Technical Notices\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eIssuance and recording of opinions: Favorable, Favorable with reservations, Unfavorable.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.9 Receptions\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eProvisional and final acceptances: date, reservations, lifting of reservations and minutes (PV).\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.10 Intervention Planning\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eMonthly calendar aggregating visits, receptions and mission deadlines, with month-by-month navigation and legend by event type.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.11 Controllers\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eLinking with Dolibarr users and the HR module. Monitoring of specialization, qualification, certification and workload.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.12 Quality Control\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eManagement of internal non-conformities, customer complaints, quality audits and corrective actions. Compatible with an ISO 9001 approach.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.13 Financial Monitoring\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eLinks with Quotes, Orders and Invoices. Profitability indicators by mission, by client and by project; monthly revenue graph.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e3.14 Document Management (DMS)\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eSpecialized document management system: plans, calculation notes, reports, photos, minutes, contracts, with version control.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e4. \"Mission Control Center\" dashboard\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eThe decision-making dashboard is organized into four areas:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN\" style=\"color: #0d6e7a;\"\u003eZone A — \u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN\"\u003eVision Direction: active missions, completed missions, projects under control, monthly revenue, pending reports, open reserves.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN\" style=\"color: #0d6e7a;\"\u003eZone B — \u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN\"\u003eTechnical Activity: missions by area, visits by month, reserves by category, validated reports (graphs).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN\" style=\"color: #0d6e7a;\"\u003eZone C — \u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN\"\u003eReal-Time Planning: today's interventions, available controllers, urgent missions, scheduled receptions.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN\" style=\"color: #0d6e7a;\"\u003eZone D — \u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN\"\u003eCritical Alerts: delayed reports, critical reserves, outdated missions, upcoming receptions.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e5. Reporting\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eThe Reporting menu includes four report categories, which can be exported to CSV, Excel, and PDF:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eTechnical reports: missions by period, missions by area, reserves by category, reports by project.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eFinancial reports: Revenue per month, revenue per customer, profitability.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eResource reports: controller productivity, time spent, occupancy.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eQuality reports: reservations, non-conformities, complaints.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e6. Integration, rights and automation\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e6.1 Dolibarr Integration\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eDirect links to Third Parties, Projects, Tasks, Quotes, Orders, Invoices, HR, Calendar and Documents. Project creation from a mission, invoicing, task creation from reserves and appointments from visits.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e6.2 User rights\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003e46 granular permissions: Read, Create\/Modify, Delete, and Validate\/Close for each business object, plus Reporting and Administration. Typical user profiles: technical director, senior controller, controller, quality manager, salesperson, accountant, administrator.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e6.3 Automatic alerts\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eDaily scheduled task (cron) detecting: overdue missions and reports, open critical reserves, approaching receipts and missed reserve deadlines.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003e6.4 Demonstration Data\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eUpon initial activation, a realistic and consistent dataset is automatically installed (clients, projects, missions, studies, visits, reservations, reports, opinions, acceptances, controllers, quality, documents). Installation and removal are done with a single click from the settings.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch1\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 17.0pt; mso-bidi-font-size: 14.0pt; line-height: 115%; color: #0d6e7a;\"\u003e7. Technical Architecture\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h1\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN\"\u003eGeneric engine: lists and records are driven by field definitions ($fields) of CommonObject classes; each page is a lightweight stub. The module is multi-entity; all tables have entity, date_creation, tms, fk_user_creat, fk_user_modif, and status.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e \u003c\/p\u003e\n\u003ch2\u003e\n\u003cspan lang=\"EN\" style=\"font-size: 13.5pt; mso-bidi-font-size: 13.0pt; line-height: 115%; color: #16a0aa;\"\u003eFuture developments expected\u003c\/span\u003e\u003cspan lang=\"EN\"\u003e\u003c\/span\u003e\n\u003c\/h2\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eMobile application\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eElectronic signature of reports\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eQR Code on technical notices\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eCustomer portal\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eAI for analyzing reserves and reports\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003eAutomatic generation of recommendations\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt; margin: 0cm 0cm 2.0pt 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cspan lang=\"EN\"\u003emodule's full REST API\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan lang=\"EN\" style=\"font-size: 11.0pt; line-height: 115%; font-family: 'Calibri',sans-serif; mso-fareast-font-family: 'MS Mincho'; mso-fareast-theme-font: minor-fareast; mso-bidi-font-family: Arial; mso-bidi-theme-font: minor-bidi; color: #222222; mso-ansi-language: EN; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;\"\u003eBIM integration and digital models\u003c\/span\u003e\u003c\/p\u003e","brand":"Dolibarr Resources","offers":[{"title":"Default Title","offer_id":53697051361598,"sku":null,"price":299.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0986\/4174\/0094\/files\/LogoBureaucontroleTechnique.png?v=1780773115","url":"https:\/\/doliresources.com\/products\/control-office-management-dolibarr","provider":"DoliResources","version":"1.0","type":"link"}