{"product_id":"opc-project-management-pro-dolibarr","title":"OPC PROJECT MANAGEMENT PRO - Dolibarr","description":"\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e1. Overview\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eOPC Project Management Pro transforms Dolibarr ERP\/CRM into a complete OPC platform (Ordonnancement, Pilotage et Coordination — Scheduling, Steering and Coordination) dedicated to construction, infrastructure, building and civil-engineering projects. It covers the full scope of work of an OPC firm, a project owner (MOA), a project supervisor (MOE) or an engineering office, from the master schedule down to the lifting of the last reserve.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe module is designed as a real-time \"Construction Control Center\": a single platform where the OPC manager schedules the works, steers operations, coordinates the intervening companies, tracks progress and delays, manages reserves, risks and documents, and reports to every stakeholder — without any third-party software.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003ePremium design — Construction Control Center\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe interface follows a construction-grade visual charter built around four colours: Technical Blue, Site Orange, Concrete Grey and Progress Green. It offers dynamic cards, an interactive timeline, visual progress bars, intelligent alerts and a real-time project view.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e2. OPC Dashboard — Construction Control Center\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe dashboard is inspired by the control rooms of large infrastructure projects. Its central real-time view exposes, at a glance, the health of the whole portfolio:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eGlobal progress (%)\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — weighted average completion of the portfolio\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eActive lots\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — technical lots currently in progress\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eDetected delays\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — lots, tasks and milestones running late\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eReached \/ late milestones\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — contractual, technical and financial milestones\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eOpen \/ lifted reserves\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — snags under treatment vs. cleared\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003ePending actions\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — actions and decisions awaiting completion\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eStrategic KPI zones\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eBeyond the central view, the dashboard groups the strategic indicators into four steering zones:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eProject steering\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — global progress, open tasks, completed tasks, realization rate.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eCoordination\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — intervening companies, meetings held, open and closed actions.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eWorksite\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — lots in progress, completed lots, late lots, open reserves.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eFinancial performance\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — forecast budget, consumed budget, budget gap, unpaid invoices.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eCharts\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe dashboard embeds interactive charts: lots distribution, reserves evolution (opened vs. lifted), progress by lot and company workload. The reporting hub additionally provides the progress curve, the project S-curve, the delays evolution and the risks evolution.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e3. OPC Projects \u0026amp; Technical Lots\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eOPC projects\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eEach project records the full contractual context: reference, name, client, project owner (MOA), project supervisor (MOE), responsible OPC manager and location, together with the operational data: surface, forecast budget, consumed budget, start and end dates, phase and progress. A project can be linked to a native Dolibarr project for accounting and time-tracking continuity.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eTechnical lots\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eProjects are broken down into the standard technical lots of a construction operation: structural works (gros œuvre), VRD (roads \u0026amp; utilities), electricity, plumbing, HVAC, architecture and finishing works. Each lot carries its titular company, its responsible, its amount, its planning and its progress, and automatically surfaces its delay in days.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e4. Master Schedule \u0026amp; Detailed Schedule\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eMaster schedule (Gantt)\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eA strategic Gantt view displays the project phases, the milestones, the task bars grouped by lot and the critical path (highlighted in red). Progress is overlaid on each bar. The timeline can be switched between day, week, month and year scales.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eDetailed schedule\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe operational schedule manages tasks and sub-tasks with their assignments, planned start\/end and actual start\/end dates, durations, progress and critical-path flag — enabling a precise follow-up of the variance between forecast and reality.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eMilestones\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eContractual, technical and financial milestones are tracked with their planned date, actual date and gap in days, and a reached\/late status that feeds the dashboard and the alerts.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e5. Coordination, Meetings, Reports \u0026amp; Actions\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eIntervening companies\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eEvery company working on the project has a complete record: coordinates, assigned lots, contract reference, decennial insurance and expiry, linked Dolibarr third party, and a history of meetings, reserves and delays.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eSite coordination\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eA drag-and-drop Kanban board drives the coordination of stakeholders through the action workflow (to do → in progress → waiting → done → validated), covering technical interfaces, schedule conflicts, resolution and validation.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eSite meetings \u0026amp; meeting reports\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eSite meetings store the convocation, agenda, attendees and animator. Each meeting generates a meeting report (compte rendu) with its summary and validation state, exportable to PDF and Word.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eActions \u0026amp; decisions\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eCorrective actions, preventive actions and site decisions are tracked with their responsible, due date, priority and workflow stage, and remain linked to the originating meeting and company.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e6. Reserves, Risks \u0026amp; Delays\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eReserve (snag) management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eTechnical, quality and safety reserves follow a full lifecycle — opening, assignment, lifting and validation — with their localization, severity and responsible company. The reserve-lift rate is computed automatically.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eRisk management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe risk register classifies technical, financial and schedule risks, computes the criticality as probability × impact, and presents a colour-coded 5×5 risk matrix together with the mitigation plan and the risk owner.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eDelay management\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eDelays are detected automatically by lot, task and milestone, with their severity, causes and impacts, so corrective actions can be triggered before they become critical.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e7. Documents, Drawings \u0026amp; Visa Workflow\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe document register manages plans, calculation notes, reports and minutes (PV) with full versioning. A visa (approval) workflow board organises documents into three columns — submitted, approved, rejected — with one-click approve \/ reject \/ resubmit actions, the visa date and the approver.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e8. Progress Tracking \u0026amp; OPC Indicators\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eProgress tracking\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eProgress is computed automatically along three axes: physical progress (average of lot progress), financial progress (consumed budget over forecast budget) and documentary progress (share of approved documents), each shown as a colour progress bar per project.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eOPC indicators\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe indicators page exposes the standard project-control metrics:\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eSPI — Schedule Performance Index\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — compares completed tasks with the tasks expected to be done by now.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eCPI — Cost Performance Index\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — compares earned value with the actual cost.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eRealization rate\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — share of completed tasks.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eDelay rate\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — share of lots running late.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eReserve-lift rate\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — share of reserves cleared.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe risk matrix completes the page with the portfolio risk exposure.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e9. BI Reporting Hub\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eA complete reporting hub groups the reports by family: planning (master \u0026amp; detailed schedule), progress (global \u0026amp; by lot), reserves (open \u0026amp; lifted), delays (by lot \u0026amp; critical), meetings (reports \u0026amp; actions) and risks (matrix \u0026amp; action plans). Every report can be printed and exported to CSV, Excel, PDF and Word.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e10. Client Portal \u0026amp; Native Integration\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eSecure client portal\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eA per-project secure portal lets the client consult progress, schedules, reserves, meeting reports and downloadable reports.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eNative Dolibarr integration\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eThe module enriches native Dolibarr and links directly with third parties, contacts, projects, tasks, agenda, ECM (document management), quotes, orders, invoices, payments and HR. Built-in automation integration points map an OPC project to a Dolibarr project, a meeting to the agenda, an action to a task and a report to the ECM.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eAutomation engine\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eA daily cron engine refreshes the milestone states (reached \/ gap), the lot delays (from actual vs. planned schedule), the project physical progress and the risk criticality, and can raise delay and open-reserve alerts with Email \/ WhatsApp notifications.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e11. Demonstration Data \u0026amp; User Profiles\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eDemonstration dataset\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eFrom the setup page, a one-click generator installs a full, coherent demonstration dataset — 20 projects, 100 companies, 140 lots, 500 tasks, 200 milestones, 300 reserves, 100 risks, 200 meetings, 200 reports, 500 actions and 150 documents, plus native third parties, quotes and invoices — and a secure purge removes it completely.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003eUser profiles \u0026amp; permissions\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eGranular permission groups support the OPC user profiles — project director, OPC, project manager, site coordinator, MOE, MOA, consultant and administrator: Projects \u0026amp; lots, Planning \u0026amp; milestones, Coordination, Reserves \u0026amp; risks, Documents \u0026amp; visas, Progress \u0026amp; indicators, Reporting and Administration. Read and write are granted by default so the module is usable immediately after activation.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv style=\"mso-element: para-border-div; border: none; border-bottom: solid #EA7317 1.5pt; padding: 0cm 0cm 2.0pt 0cm;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"border: none; mso-border-bottom-alt: solid #EA7317 1.5pt; padding: 0cm; mso-padding-alt: 0cm 0cm 2.0pt 0cm;\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 16.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #1e3a5f;\"\u003e12. Technical Specifications\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp class=\"MsoListBulletCxSpFirst\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eCompatibility\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — Dolibarr v16 → v23+, PHP 8+, MySQL \/ MariaDB.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eArchitecture\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — Multi-entity, multi-company, SaaS-ready.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eLanguages\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — French, English, Italian, German, Spanish.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpMiddle\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eData model\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — 13 dedicated SQL tables (llx_opc_*), all carrying entity, status, audit and import-key columns.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoListBulletCxSpLast\" style=\"margin-left: 18.0pt; mso-add-space: auto; text-indent: -18.0pt; mso-list: l0 level1 lfo1; tab-stops: list 18.0pt;\"\u003e\u003c!-- [if !supportLists]--\u003e\u003cspan lang=\"EN-US\" style=\"font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol;\"\u003e\u003cspan style=\"mso-list: Ignore;\"\u003e·\u003cspan style=\"font: 7.0pt 'Times New Roman';\"\u003e       \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c!--[endif]--\u003e\u003cspan dir=\"LTR\"\u003e\u003c\/span\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"color: #1e3a5f;\"\u003eEngine\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e — Generic key-driven engine, self-healing schema, GPLv3 licence.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\"\u003e\u003cb style=\"mso-bidi-font-weight: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 12.5pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #2563eb;\"\u003ePlanned evolutions\u003c\/span\u003e\u003c\/b\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 6.0pt;\"\u003e\u003cspan lang=\"EN-US\"\u003eBIM integration \u0026amp; IFC viewer · AI-based delay prediction \u0026amp; schedule optimisation · drone worksite monitoring · OPC \u0026amp; worksite mobile apps · OCR of drawings \u0026amp; meeting minutes · Microsoft Project \u0026amp; Primavera P6 synchronisation · Power BI \u0026amp; Autodesk Construction Cloud connectors · electronic signature, advanced client portal and full REST API.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp class=\"MsoNormal\" align=\"center\" style=\"text-align: center;\"\u003e\u003ci style=\"mso-bidi-font-style: normal;\"\u003e\u003cspan lang=\"EN-US\" style=\"font-size: 9.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%; color: #6b7280;\"\u003e© 2026 DoliResources — https:\/\/www.doliresources.com\u003c\/span\u003e\u003c\/i\u003e\u003cspan lang=\"EN-US\"\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"Dolibarr Resources","offers":[{"title":"Default Title","offer_id":53702729171262,"sku":null,"price":299.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0986\/4174\/0094\/files\/LogoOPC.png?v=1780907255","url":"https:\/\/doliresources.com\/products\/opc-project-management-pro-dolibarr","provider":"DoliResources","version":"1.0","type":"link"}