Skip to product information
1 of 80

Advanced Tunnel & Underground Works Management for Dolibarr

Regular price €299,00
Regular price Sale price €299,00
Sold out

Module overview

Advanced Tunnel & Underground Works Management turns Dolibarr into a complete professional platform to manage the entire life cycle of...

5 people are viewing this right now

View full product details

Module overview

Advanced Tunnel & Underground Works Management turns Dolibarr into a complete professional platform to manage the entire life cycle of tunnels and underground structures — road, motorway, railway, metro and tramway tunnels, technical galleries, cut-and-cover tunnels and ancillary underground works — from studies and construction through operation, safety, monitoring, maintenance and renovation. It targets owners, road and rail operators, motorway concessionaires, local authorities, engineering firms and underground-works contractors. It adds 54 business objects, a control-room dashboard, decisional reporting, a REST API, an alert engine and a full demo dataset, without modifying the Dolibarr core.

Key functional areas

Tunnel asset management

·       Asset portfolios grouping tunnel networks and axes, with owner, operator and asset manager.

·       Tunnels (road, motorway, railway, metro, gallery, cut-and-cover, underpass) with full technical fiche.

·       Sections and zones: tubes, sections, safety niches, refuges, emergency exits, technical rooms.

·       Ancillary works: portals, shafts, cross-passages, control centres, technical buildings.

Studies, geotechnics and construction

·       Studies: feasibility, geotechnical, ventilation, fire, structural, evacuation, lighting, traffic, hydrogeology.

·       Construction phases and progress tracking, from site setup and excavation to lining and commissioning.

Equipment registry by system

·       Ventilation and smoke extraction, permanent / reinforcement / safety lighting.

·       Power supply and electrical distribution, backup power (UPS, generators).

·       Fire safety (FSS), CCTV and automatic incident detection (AID).

·       Communications, emergency call points, drainage and pumping, BMS/SCADA supervision.

·       Technical rooms, electrical circuits and cables (including fire-resistant CR1 cables).

Operation and control centre

·       Operation control centre (PCC) view, logbook, traffic and circulation, availability.

·       Sensors and meters (CO, opacity, air speed, luminance, traffic, level, electrical), readings and energy tracking.

Inspection, monitoring and maintenance

·       Ouvrage and equipment inspections, structural defects and pathologies, regulatory controls.

·       Condition monitoring and instrumentation with thresholds and alerts; predictive analysis.

·       CMMS: preventive, corrective and condition-based maintenance, job plans, checklists, work orders, time and parts logging, work permits.

Incidents, safety and works

·       Incidents and events (accident, fire, smoke, stopped vehicle, wrong-way driving, ventilation failure, flooding).

·       Emergency plans and safety drills; non-conformities.

·       Construction sites and works: new build, renovation, upgrade to standards, planning, budgets and costs.

Commercial, contracts and resources

·       Opportunities, technical visits, contracts and public/private tenders, amendments, renewals, SLAs, warranties.

·       Claims and satisfaction surveys, invoicing schedules.

·       Technicians, teams, certifications/authorisations, on-call, subcontractors, tools, spare parts, stock, purchasing, budgets.

Dashboard, reporting and alerts

A control-room dashboard (Tunnel Control Center) presents KPIs (tunnels, equipment availability, open incidents, critical alarms, monthly cost, SLA compliance) and an interactive synoptic of the tunnel portfolio with real-time status. A multi-tab reporting module covers assets, interventions, corrective and preventive maintenance, SLA, financials, compliance and energy. An alert engine flags faulty equipment, overdue maintenance and inspections, exceeded thresholds, critical stock, expiring warranties and controls.

Dolibarr integration

The module integrates with native Dolibarr modules: Third Parties, Contacts, Products, Services, Stock, Warehouses, Projects, Tasks, Contracts, Proposals, Sales Orders, Invoices, Interventions, Agenda and DMS. From a tunnel, site, work order or incident, users can create related Dolibarr objects (projects, interventions, quotes, orders, invoices, agenda events).

REST API and security

A secured REST API exposes tunnels, sections, equipment, inspections, sensors, readings, work orders, incidents and reports, with Dolibarr authentication, permission checks, filtering and JSON responses. The module uses fine-grained permissions, multi-entity support, CSRF protection, escaped output and parameterised SQL, and does not store any hard-coded secret.

Multilingual support

The interface is fully translated into French, English, Italian, German and Spanish. All menus, fields, buttons, statuses, messages and reports are translatable; no business text is hard-coded in the pages.

Demo data

A realistic demo dataset can be loaded and purged from the module configuration. It creates tunnel portfolios, tunnels, zones, technical systems, equipment, sensors, incidents, inspections, maintenance plans, work orders, construction sites, contracts, teams, stock and alerts — including edge cases (open incidents, overdue maintenance, critical alarms, expiring warranties) so every dashboard tile is populated.

Deliverables and installation

·       module_gestiontunnels-1.0.zip — the installable Dolibarr module.

·       French training manual (PDF) with ~79 annotated screenshots.

·       This English feature description (DOCX), technical documentation and test report.

Install from Home > Setup > Modules > Deploy/install external module, upload the ZIP, then enable 'Gestion Tunnels' under the 'Projects & Technical Management' family. Compatible with Dolibarr 16+ (tested on 17.0.x) and PHP 7.1+ (PHP 8 compatible).


Copyright © 2026 DoliResources — All rights reserved — www.doliresources.com